Master the installation of Taurus Adjustable Pedestals. Watch video tutorials, follow step-by-step instructions, and download technical manuals for both paving and decking projects.
Quick, visual guides to help your crew master the TA Series system in minutes.

A complete walkthrough of the standard wedge system. Learn the optimal placement techniques for large format porcelain tiles.

See how the twist-cap system speeds up installation without the need for specialized pliers, perfect for both DIY and pros.

Step-by-step guide on inserting, twisting, and safely removing our reusable T-Lock steel pins without scratching the glaze.
Follow these best practices to ensure a level, stable, and durable raised floor using TA Series pedestals.
Apply the thin-set mortar using a notched trowel. For large format tiles, back-buttering is highly recommended to ensure 100% coverage. Place the first tile firmly into position.
Slide the base of the leveling clips under the tile. Position them approximately 50mm (2 inches) from each corner. For longer tiles, add additional clips along the center of the edge.
Lay the adjacent tile snugly against the clips. Push the reusable wedges through the hole in the clips. Push firmly until the two tiles align perfectly at the same level.
Leave the clips and wedges in place while the thin-set mortar fully cures. Do not walk heavily on the tiles or attempt to remove the leveling system during this drying phase.
Once the mortar is completely dry, remove the system by kicking the clips with your work boot or striking them with a rubber mallet. The clips will snap cleanly at the base.
Access our complete library of installation manuals, spec sheets, and CAD details for your project blueprints.
Our engineering team can help calculate the exact number of pedestals and provide custom layout drawings for your project.